District Planning Office

 

 I.   Introduction:

               The District Planing Unit, Aalo was established in the year 1995 under the establishement of the Deputy Commissioner, West Siang Dsitrict, Aalo. It is headed by District Planining Officer (G-A-Gazetted), and assisted by one Senior Reseach Assistant (G-B-Gaetted), one L.D.C., one driver and one contingency peon. Basically, teh main function of the department is to monitor implementation of various developmental schemes in the district both funded under State Plans as well as of Centrally Sponored Schemes and also to coordinate in plan formulation works of other departments.

II. Schemes:
              Amongst others, the schemes under following major progammes are being implemented through this department: -
              i) Border Area Development Programme (BADP).
              ii) Members of Parliament Local Area Development Scheme (MPLADS), being nodal district of 1-West Aunachal Parliamentary Constituency (LS).
              iii) Members of Legislative Assembly Local Area Development Scheme(MLALADS).
              iv) United Fund.

              Details of Schemes Implemented Under MLALADS in West Siang Dsitrict, Aalo for the year 2010-11, 27-Liromoba

Sl. No.
Name of Scheme
Sanction Order No & Date
Sanction Amount
Expenditure Incurred
Name of E/Agency
Physical Status
1
2
3
4
5
6
7
1 Procurement of Housing Assistance for Rofing Materials (CGI Sheet) Ph-I. No. WS/MLALADS-3/2010-11 dt. 15/12/2010 Rs.10,00,000/- Rs.10,00,000/- BDO-Aalo East Completed
2 Procurement of Housing Asistancefor Rofting Materials (CGI Sheet) Ph-II. No. WS/MLALADS-3/2010-11 dt. 15/12/2010 Rs. 7,50,000/- Rs.7,50,000/- BDO-Aalo East Completed
3 C/O MIC Rupin at Karga. No. WS/MLALADS-3/2010-11 dt. 23/12/2010 Rs.1,00,000/- Rs.1,00,000/- BDO-Liomoba Completed
4 C/O MIC at Esse Lipu Moba. No. WS/MLALADS-3/2010-11 dt. 23/12/2010 Rs.1,00,000/- Rs.1,00,000/- BDO-Liomoba Completed
5 C/O L/D at Biri. No. WS/MLALADS-3/2010-11 dt. 23/12/2010 Rs.1,00,000/- Rs.1,00,000/- BDO-Liomoba Completed
6 C/O CC step at Ligi Village. No. WS/MLALADS-3/2010-11 dt. 23/12/2010 Rs.1,00,000/- Rs.1,00,000/- BDO-Liomoba Completed
7 Extn. of Pokto dere a Pokto Village. No. WS/MLALADS-3/2010-11 dt. 23/12/2010 Rs.2,00,000/- Rs.2,00,000/- BDO-Liomoba Completed
8 C/O MIBT Teacher Qtrs. at Essi Kirte. No. WS/MLALADS-3/2010-11 dt. 04/01/2011 Rs.2,00,000/- Rs.2,00,000/- BDO-Liomoba Completed
9 C/O Art & Culture Hall at Kamba. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
10 C/O MIC at Bap rover at Soru Tali. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.50,000/- Rs.50,000/- APEDA, Aalo Completed
11 C/O Siru MIC at Gamkak near Tea Garden. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
12 C/O MIC at Soe river at Daba Gamlin. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
13 C/O Foot Suspension Bridge at Laggi. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
14 C/O) Porter Track in between Yomcha and Daba Gamlin. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.40,000/- Rs.40,000/- APEDA, Aalo Completed
15 C/O Bus Stand at Kamba-Darak Road. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.40,000/- Rs.40,000/- APEDA, Aalo Completed
16 C/O CC Steps at Yomcha Village. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
17 C/O L/D at A.D.C. Office- Kamba. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.50,000/- Rs.50,000/- APEDA, Aalo Completed
18 C/O LC Type Dere at Yomcha. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs. 5,00,000/- Rs. 5,00,000/- APEDA, Aalo Completed
19 C/O MIC at Sekor Nallah at Laggi Gamlin. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
20 C/O Toilet a Pry. School at Lipu Yomcha. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,20,000/- Rs.1,20,000/- APEDA, Aalo Completed
21 C/O LC Type Dere at Degi Potom. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.5,00,000/- Rs.5,00,000/- APEDA, Aalo Completed
22 CO MIC LAD at Lipu Yomcha. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
23 C/O L/D Work at Laggi Gamli. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
24 C/O MIC at Rusi River of Siru Tali. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,50,000/- Rs.1,50,000/- APEDA, Aalo Completed
25 C/O Porter Track in between Yomcha and Potom. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
26 C/O MIC at Kunuyami. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,50,000/- Rs.1,50,000/- APEDA, Aalo Completed
27 C/O CC Step at Tapiyor. No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.1,00,000/- Rs.1,00,000/- APEDA, Aalo Completed
28 Land Development Works at Rapu Area at Tego Village (Ph-I). No. WS/MLALADS-3/2010-11 dt. 03/01/2011 Rs.3,00,000/- Rs.3,00,000/- BDO-Aalo (East) Completed
29 Land Development Works at Rapu Area at Tego Village (Ph-II). No. WS/MLALADS-3/2010-11 dt. 08/01/2011 Rs.2,00,000/- Rs.2,00,000/- BDO-Aalo (East) Completed
30 C/O RCC Gate at Yomcha. No. WS/MLALADS-3/2010-11 dt. 08/03/2011 Rs.2,50,000/- Rs.2,50,000/- PO (APEDA), Aalo Completed
31 C/O Land Development Work at Bole Village. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.1,00,000/- Rs.1,00,000/- PO (APEDA), Aalo Completed
32 C/O Land Development Work at Lirum Village. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.1,00,000/- Rs.1,00,000/- PO (APEDA), Aalo Completed
33 C/O LC Type Dere at Lubi Bane. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.3,00,000/- Rs.3,00,000/- PO (APEDA), Aalo Completed
34 C/O Community Toilet at Laggi Gamlin. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.3,00,000/- Rs.3,00,000/- PO (APEDA), Aalo Completed
35 C/O Land Development at Kayi Village. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.1,00,000/- Rs.1,00,000/- PO (APEDA), Aalo Completed
36 C/O Land Development at Liromoba. No. WS/MLALADS-3/2010-11 dt. 15/03/2011 Rs.1,00,000/- Rs.1,00,000/- PO (APEDA), Aalo Completed
    Grand Total Rs. 70,00,000/-      

30-AALO-WEST ASSEMBLY CONSTIUENCY

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1 Procurement of CGI Sheets for Rural Housing under 30""-Aalo (West) Assembly Consituency (Ph-I) No. WS/MLALADS-1/2010-11 Dated 13/08/2010 Rs.8,00,000/- Rs.8,00,000/- PD-DRDA-Aalo Completed
2 Procurement of CGI Sheets for Rural Housing under 30""-Aalo (West) Assembly Consituency (Ph-II) No. WS/MLALADS-1/2010-11 Dated 13/08/2010 Rs. 8,00,000/- Rs. 8,00,000/- PD-DRDA-Aalo Completed
3 Procurement of CGI Sheets for Rural Housing under 30""-Aalo (West) Assembly Consituency (Ph-I) No. WS/MLALADS-1/2010-11 Dated 13/08/2010 Rs. 8,00,000/- Rs. 8,00,000/- PD-DRDA-Aalo Completed
4 Procurement of CGI Sheets for Rural Housing under 30""-Aalo (West) Assembly Consituency (Ph-I) No. WS/MLALADS-1/2010-11 Dated 13/08/2010 Rs. 4,00,000/- Rs. 4,00,000/- PD-DRDA-Aalo Completed
5 C/O MIV at Rigo RWC Field. No. WS/MLALADS-1/2010-11 Dated 13/08/2010 Rs. 6,00,000/- Rs. 6,00,000/- PD-DRDA-Aalo Completed
6 C/O of MIC at Kugi (Lete Poke) WRC Field. No. WS/MLALADS-1/2010-11 Dated 04/01/2011 Rs. 1,00,000/- Rs. 1,00,000/- PD-DRDA-Aalo Completed
7 Land Protection Works at HokiStream nea RK Mision School-Aalo. No. WS/MLALADS-1/2010-11 Dated 21/02/2011 Rs. 8,00,000/- Rs. 8,00,000/- PD-DRDA-Aalo Completed
8 Land Development Work at Rigo Area (Near Poi WRC Field). No. WS/MLALADS-1/2010-11 Dated 21/02/2011 Rs. 10,00,000/- Rs. 10,00,000/- PD-DRDA-Aalo Completed
9 Retaining Wall at Sipu River near Sipu Colony. No. WS/MLALADS-1/2010-11 Dated 24/02/2011 Rs. 7,00,000/- Rs. 7,00,000/- PD-DRDA-Aalo Completed
10 Procurement of CGI Sheets for Rural Housing under 30-Aalo (West) Assembly Consitutency (Ph-1) No. WS/MLALADS-1/2010-11 Dated 24/02/2011 Rs. 8,00,000/- Rs. 8,00,000/- PD-DRDA-Aalo Completed
11 Procuremen tof CGI Sheets for Rural Housing under 30-Aalo (West) Assembly Consituency (Ph-11) No. WS/MLALADS-1/2010-11 Dated 24/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- PD-DRDA-Aalo Completed
      Grand Total Rs. 70,00,000/-    

31-AALO (EAST) ASSEMBLY CONSTITUENCY:

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1 Procurement of CGI Sheets for Housing Assistance i.e. Roofing materials - PH-1. No. WS/MLALADS-3/2010-11 Dated 13/08/2010 Rs.10,00,000/- Rs.10,00,000/- BDO-Aalo (East) Completed
2 Procurement of CGI Sheets for Housing Assistance i.e. Roofing materials - PH-11. No. WS/MLALADS-3/2010-11 Dated 13/08/2010 Rs. 10,00,000/- Rs. 10,00,000/- BDO-Aalo (East) Completed
3 Procurement of CGI Sheets for Housing Assistance i.e. Roofing materials - PH-111. No. WS/MLALADS-3/2010-11 Dated 13/08/2010 Rs. 10,00,000/- Rs. 10,00,000/- BDO-Aalo (East) Completed
4 Procurement of CGI Sheets for Housing Assistance i.e. Roofing materials - PH-1V. No. WS/MLALADS-3/2010-11 Dated 13/08/2010 Rs. 5,00,000/- Rs. 5,00,000/- BDO-Aalo (East) Completed
5 C/O Land Development works at Sri Jumkir Amo's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
6 C/O Land Development works at Sri Hokmo Karbi's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
7 C/O Land Development works at Sri Moli Lollen's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
8 C/O Land Development works at Sri Dubin Lollen's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
9 C/O Land Development works at Sri Limar Amo's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
10 C/O Land Development works at Sri NyamoAmo's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
11 C/O Land Development works at Sri Kari Lomi's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
12 C/O Land Development works at Sri Gumsok Karbi's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
13 C/O Land Development works at Sri Moto Lollen's area at kombo Pomte Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
14 C/O Land Development works at Sri Kendo Lollen's area at Tarsu-Mobuk Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed
15 C/O Land Development works at Sri Jumd Lollen's area at Tarsu-Mobuk Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
16 C/O Land Development works at Sri Limo Hira's area at Tarsu-Mobuk Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
17 C/O Land Development works at Sri Hemmon Karbi's area at Tarsu-Mobuk Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 1,00,000/- Rs. 1,00,000/- BDO-Aalo (East) Completed
18 C/O Land Development works at Sri Poto Lollen's area at Tarsu-Mobuk Village. No. WS/MLALADS-3/2010-11 Dated 29/12/2010 Rs. 50,000/- Rs. 50,000/- BDO-Aalo (East) Completed


DETAILS OF SCHMES IMPLEMENTED UNDER BORDER AREA DEVELOPMENT PROGRAMME IN RESPECT OF MECHUKHA, MONIGONG AND KAYING-PAYUM CD, BLOCK IN WEST SIANG DISRICT DURING THE YEAR 2010-11

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1 C/O CC Culvert near Community School at Bumji Panga. No. WS/BADAP-1/2010-11 dated 18/01/2010. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
2 C/O Suspension Bridge from Lakgi to Rema over Lagi river. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
3 C/O Approach Road from BRTF road to Medical Sub- Centre at Yapik. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
4 Development of ALC Line area to APP Complex at Mechukha (Community RCC Toilet). No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 6,00,000/- Rs. 6,00,000/- WRD-Basar Completed
5 C/O Boundary Wall of Kasturba Gandhi Balika Vidyalaya-Mechukha. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 9,00,000/- Rs. 9,00,000/- PWD-Mechukha Completed
6 Development of CC Culvert near Anganwadi Centre at Chudong-dong on right bank of Chorling Village. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 8,00,000/- Rs. 8,00,000/- BDO-Mechukha Completed
7 Procurement of furniture for shcools of Mechukha-Tato CD Block (Govt. Pry. School-Tagur/Govt. ME School - Yapik/Govt. Pry. School Paum/Govt. I.V School-Irgo of Tato circule and Govt. Pry. School-Gapo of Mechukha circle) No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- BDO-Mechukha Completed
8 C/O Staging Hut at Track Junction -M -1 Patrol Route, MM-2519, GR-2521-91 Map Sheet No. 82H/421 Kms ahead of Yoriong. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,50,000/- Rs. 5,50,000/- PWD-Mechukha Completed
9 C/O Staging Hut at Singedrophu-M-4-Patrol Route, MM-3228, GR-322284 Map Sheet No. 82 H/421 Kms ahead of Lamang . No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- BDO-Mechukha Completed
10 C/O Hut at Singedrophu -M-4 Patrol Rout, MM-3228, GR-322284 Map Sheet No. 82H/14. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 4,39,488/- Rs. 4,39,488/- BDO-Mechukha Completed
11 Upgradation of Water Supply at Tagur Village. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 1,50,000/- Rs. 1,50,000/- PWD-Mechukha Completed
12 Upgradation of Water Supply at Quying Village. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 1,50,000/- Rs. 1,50,000/- BDO-Mechukha Completed
13 C/O Teacher Qtrs. at Rego Pry. School. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- BDO-Mechukha Completed
14 C/O Community Hall at Padusa. No. WS/BADAP-1/2010-11 dated 18/01/2010. Rs. 5,00,000/- Rs. 5,00,000/- BDO-Mechukha Completed
15 C/O Digo-Yamo Community festival Dere-Cum-Cultural Hall at Tato. No. PD/BADP/Scheme-03/2010-11 Feb/2011 Rs. 23,00,000/- Rs. 23,00,000/- PWD-Mechukha Completed
16 C/O Compound Wall at Govt. Pry. School at Mechukha. No. PD/BADP/Scheme-04/2010-11 dated Itanagar, the 9th Feb/2011. Rs. 17,00,000/- Rs. 17,00,000/- BDO-Mechukha Completed
17 C/O Cultural Hall at Mechukha. No. PD/BADP/Scheme-05/2010-11 dated Itanagar, the 9th Feb/2011. Rs. 17,00,000/- Rs. 17,00,000/- BDO-Mechukha Completed
18 C/O 2(Two) Rooms Rest House at Mechukha Near I.B.   Rs. 16,85,512/- Rs. 16,85,512/- BDO-Mechukha Completed
    Grand total Rs. 1,44,75,000/-      

KAYING-PAYUM CD BLOCK:

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1 Purchaing of Medicines for PHC-Kaying No. WS/BADP-3/2010-11 dated 06/10/2010 Rs. 2,00,000/- Rs. 2,00,000/- DMO-Aalo Completed
2 C/O Foot Suspenion Bridge ove Hiyak river between Gasheng to Gaming (Ph-1). No. WS/BADP-3/2010-11 dated 02/12/2010 Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
3 C/O Food Suspension bridge at Ribong over Siyum river between Reying and Mega (Ph-1). No. WS/BADP-3/2010-11 dated 02/12/2010 Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
4 C/O Type-11Qtrs. for Sirum Pry. School. No. WS/BADP-3/2010-11 dated 02/12/2010 Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
5 C/O School Building for Pry. School at Gaming. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 8,00,000/- Rs. 8,00,000/- WRD-Basar Completed
6 C/O Foot Suspension Bridge at Dange over Sike river. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
7 C/O Foot Suspension Bridge at Kibung river. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
8 C/O Community MIC at WRC field at Lashi/Motung area at Kaying. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
9 C/O Community Dere at Dupu. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
10 C/O Community MIC at Keranf-11 WRC field. No. WS/BADP-3/2010-11 dated 18/01/2011 Rs. 2,50,000/- Rs. 2,50,000/- WRD-Basar Completed
11 C/O Teacher Qtrs. T-11 at Bogne Middle School. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
12 Upgradation of Foot Suspension Bridge over Siyum rvier at Kerang. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
13 Extn. of one room shcool building at Kaying Pry. School. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
14 Provison for furniture for Paksing Pry. School. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 1,00,000/- Rs. 1,00,000/- WRD-Basar Completed
15 C/O Community Toilet at Bogne. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,50,000/- Rs. 2,50,000/- WRD-Basar Completed
16 C/O CC Drainage at Kerang-1. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,50,000/- Rs. 2,50,000/- WRD-Basar Completed
17 Development of Social Forestry at Kaying. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
18 C/O CC steps from Lower Kerang to Upper Kerang at Kerang Village. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
19 C/O CC steps from bridge Points to Gate Village (Ph-1). No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
20 C/O Foot Suspension Bridge over Sinyot river at Gasheng (Ph-11). No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 3,00,000/- Rs. 3,00,000/- WRD-Basar Completed
21 Purchasing of furniture for Pry. School at Gaming. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 1,00,000/- Rs. 1,00,000/- WRD-Basar Completed
22 Upgradation of Foot Suspension Bridge over Yubbung river. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
23 C/O Commnity Toilet at Payum Hq. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
24 C/O Community Toilet at Gasheng Village. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 2,00,000/- Rs. 2,00,000/- WRD-Basar Completed
25 C/O CC step connecting lower block to upper block at HS School-Kaying. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 44,872/- Rs. 44,872/- WRD-Basar Completed
26 C/O CC Fencing for PHC-Kaying. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
27 C/O CC Community Dere at Yio. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 6,00,000/- Rs. 6,00,000/- WRD-Basar Completed
28 C/O Community Dere at Row Village. No. WS/BADP-3/2010-11 dated 08/02/2011 Rs. 4,00,000/- Rs. 4,00,000/- WRD-Basar Completed
29 C/O Community Centre (Dere) at Bogne Village. No. WS/BADP-3/2010-11 dated 02/12/2010 Rs. 8,00,000/- Rs. 8,00,000/- PWD-Rumgong Completed
30 C/O School Auditiruyn-cum-Indoor Club at Higher Secondary School-Kaying. No. PD/BADP/Scheme-08/2010-11 date Itanagar, the 9th feb/2011. Rs. 22,80,128/- Rs. 22,80,128/- PWD-Rumgong Completed
31 C/O Foot Suspension Bridge at Menchung over Siyum River. No. PD/BADP/Scheme-09/2010-11 dated Itanagar, the 9th Feb/2011. Rs. 18,00,000/- Rs. 18,00,000/- PWD-Rumgong Completed
32 C/O Foot Suspension Bridge at Chenge over Siyum River between Pame and Bo (Ph-1). No. WS/BADP-3/2010-11 dated 02/12/2010. Rs. 5,00,000/- Rs. 5,00,000/- WRD-Basar Completed
    Grand Total Rs. 1,44,75,000/- Rs. 1,44,75,000/-    

MONIGONG-PIDI CD BLOK:

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1 C/O Type-11 Teacher Qtrs. at Govt. Pry. School Soyorgong. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs. 6,00,000/- Rs. 6,00,000/- BDO-Monigong Completed
2 C/O Community School Building at Soyorgong Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
3 C/O MT Type-11 Building for Teacher Qtrs. at Govt.-IV School-Lungte. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.6,00,000/- Rs.6,00,000/- BDO-Monigong Completed
4 Extn. of Community Hall at Lungte Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
5 C/O Community Hall at Takinglingtak Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.6,00,000/- Rs.6,00,000/- BDO-Monigong Completed
6 C/O School Building for Govt. Pry. School at Pangri. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
7 C/O School Building at Govt. Pry. School at Hemi Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.5,00,000/- Rs.5,00,000/- BDO-Monigong Completed
8 C/O Community Hall at Besamg Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.5,00,000/- Rs.5,00,000/- BDO-Monigong Completed
9 C/O Community Hall at Didu Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.6,00,000/- Rs.6,00,000/- BDO-Monigong Completed
10 C/O CC Steps from Gapur Village to PWD Road. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
11 C/O CC Steps from Gesing Bridge Point to Singbu Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.6,00,000/- Rs.6,00,000/- BDO-Monigong Completed
12 C/O CC Steps from Simugong Village to Govt. Pry. School, Simugong. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
13 C/O Community Sanitary Toilets and Extn. of Cultural Hall at Monigong Town. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.9,00,000/- Rs.9,00,000/- BDO-Monigong Completed
14 C/O Community School Building at Ramo Sumi Village. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
15 C/O Mule Track ahead of Bridge point between Tadadege and Henkar. No. WS/BADP-2/2010-11 dated 21/09/2010 Rs.3,00,000/- Rs.3,00,000/- BDO-Monigong Completed
16 Procurement of School furniture for Monigong-Pidi Block. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs.5,85,512/- Rs.5,85,512/- BDO-Monigong Completed
17 C/O Staging Hut at Shimoku-Simu M-7 Patrol Route, MM-6646, GR-664462, Map Sheet No. 821/5 40 Km ahead of Monigong. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 3,39,488/- Rs. 3,39,488/- BDO-Monigong Completed
18 C/O Iron Bridge for Crossing Mules over river Siyom between Tadadege and Henkar. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 8,50,000/- Rs. 8,50,000/- PWD-Mechukha Completed
19 C/O CC Steps form BRTF Road to Govt. Pry. School-Chengo. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 9,00,000/- Rs. 9,00,000/- PWD-Mechukha Completed
20 C/O Total Community Sanitary Drainage at Sajigong Village. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 9,00,000/- Rs. 9,00,000/- PWD-Mechukha Completed
21 C/O New Bridge at Talomjedom river in between Simugong to Monigong. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 7,00,000/- Rs. 7,00,000/- PWD-Mechukha Completed
22 C/O 3(three) room SPT Gust House at transit Camp, Karo (Tatik Village). No. WS/BADP/Scheme-07/2010-11 dated Itanagar,t he 19th Feb/2011 Rs. 14,00,000/- Rs. 14,00,000/- PWD-Mechukha Completed
23 C/O Step from BRTF road to Ruku Village. No. WS/BDP-2/2010-11(Part) dated 18/01/2011. Rs. 9,00,000/- Rs. 9,00,000/- WRD-Basar Completed
24 C/O Cultural Hall at Karle. No. WS/BADP-2/2010-11 (Part) dated 18/01/2011 Rs. 9,00,000/- Rs. 9,00,000/- WRD-Basar Completed
    Grand Total Rs. 1,44,75,000/- Rs. 1,44,75,000/-    

DETAILS OF SCHEMES IMPLEMENTED UNDER UNITED FUND IN WEST SIANG DISTRICT, AALO FOR THE YEAR 2010-11.

Sl. No.
Name of the Scheme
Sanction Order No. & Date
Sanction Amount
Expenditure incurred
Name of E/Agency
Physical Status
1
2
3
4
5
6
7
1 C/O MIBT Bachelor Brrack for 2 (two) Unites at Yomcha. No. WS/United Fund-01/2008-11 dated 24/08/2010. Rs. 6,00,000/- Rs. 6,00,000/- PWD-Yomcha Completed
2 C/O SPT Type Qtrs. for ADC Staff at Yomcha-11 No. WS/United Fund-01/2008-11 dated 24/08/2010. Rs. 4,00,000/- Rs. 4,00,000/- PWD-Yomcha Completed
3 Extension of Rooms at DC Office, Aalo (Ph-1). No. WS/United Fund-01/2008-11 dated 03/11/2010. Rs. 10,00,000/- Rs. 10,00,000/- UPO (DUDA), Aalo Completed
4 Extension of Rooms at DC Office-Aalo (Ph-11) No. WS/United Fund-01/2008-11 dated 03/11/2010 Rs. 10,00,000/- Rs. 10,00,000/- UPO (DUDA), Aalo Completed
5 C/O Play Ground and Security Fencing for Abo-Tani Philantropic Mission at Bogdo. No. WS/United Fund-01/2008-11 dated 02/12/2010. Rs. 5,00,000/- Rs. 5,00,000/- PWD-Aalo Completed
6 Organzing Siang River Festival (Yomgo) River at Aalo. No. WS/United Fund-01/2008-11 dated 28/01/2010. Rs. 10,00,000/- Rs. 10,00,000/- DTO (Tourism) Completed
7 Procurement of Medicines for DH, SCs and CHCs-Aalo. No. WS/United Fund-01/2008-11 dated 13/10/2010. Rs. 10,00,000/- Rs. 10,00,000/- DMO-Aalo Completed
8 Procurement of Medicines for CHC-Yomcha. No. WS/United Fund-01/2008-11 dated 13/10/2010. Rs. 5,00,000/- Rs. 5,00,000/- DMO-Aalo Completed
9 Organizing 2nd Siang Fraternity Football Tournament at Aalo. No. WS/United Fund-01/2008-11 dated 14/03/2010. Rs. 5,00,000/- Rs. 5,00,000/- District Sports Association, Aalo Completed
10 Restoration of Water Supply at Aalo Township. No. WS/United Fund-01/2008-11 dated 18/03/2010. Rs. 10,00,000/- Rs. 10,00,000/- EE (PHE & WS),Aalo Completed
11 Procurement of 2 Sets of 25 KVA Silent DG Sets for Tato and Monigong. No. WS/United Fund-01/2008-09 (Part) dated 21/03/2011. Rs. 10,00,000/- Rs. 10,00,000/- EE (Elect.), Aalo Completed
12 Procuremnt of 125 KVA Silent DG Set for Mechukha (Ph-i). No. WS/United Fund-01/2008-09 (Part) dated 21/03/2011. Rs. 10,00,000/- Rs. 10,00,000/- EE (Elect.), Aalo Completed
13 Procurement of 125 Silent DG Set for Mechukha (Ph-ii) No. WS/United Fund-01/2008-09 (Part) dated 21/03/2011. Rs. 10,00,000/- Rs. 10,00,000/- EE (Elect.), Aalo Completed
    Grand Total Rs. 1,05,00,000/- Rs. 1,05,00,000/-    

 

              DISTRICT-WISE SCHEMES /PROJECTS SANCTIONED UNDER MPLADS IN RESPECT OF
              1-ARUNACHAL (WEST) PARLIMENTARY CONSTITUENCY OF 15TH LOKH SABHA

                                                         IST INSTALLMENT OF 2010-11

Sl. No.
Name of the Scheme
Date of recommendation
Amount sancitoned/releaed
District
1
C/o Retaining Wall at Raksap Colony near Youth Hostel, Naharlagun.
11/12/2009
Rs. 5,00,000/-
PAPUMPARE
2 C/O Retaining Wall at Chandranagar, Itanagar.
05/02/2010
Rs. 5,00,000/-
PAPUMPARE
3 C/O Community Hall, Naharlagun.
15/07/2010
Rs. 10,00,000/-
PAPUMPARE
4 C/O Boundary wall at Jite Ane Mission School, Kimin.
11/11/2010
Rs. 3,00,000/-
PAPUMPARE
5 C/O Retaining Wall at Forest Colony, Hapoli.
06/01/2010
Rs. 5,00,000/-
LOWER SUBANSIRI
6 State Matching share for implementation of Project under CSS-IWDP (Haryali), West Kameng Project-II in Thrizino CD Block.
26/03/2010
Rs. 6,00,000/-
WEST KAMENG
7 State Matching share for implementation of project under CSS-IWDP (Hariyali), West Kameng Project-VI West Kameng.
26/03/2010
Rs. 1,50,000/-
WEST KAMENG
8 C/O Cultural Hall at Boha village in Kalaktang Circle.
09/07/2010
Rs. 5,00,000/-
WEST KAMENG
9 C/O Cultural Hall in Ankling Village in Kalaktang Circle.
09/07/2010
Rs. 5,00,000/-
WEST KAMENG
10 C/O Community Hall (Dere) at Ragi village, Aalo Circle.
31/03/2010
Rs. 7,00,000/-
WEST SIANG
11 Extension/up-gradation of Community Hall (Dere) at Wak Village, Aalo Circle.
31/03/2010
Rs. 3,00,000/-
WEST SIANG
12 C/O Land Protection at Sipu (Marge) River, Aalo Circle.
11/06/2010
Rs. 12,00,000/-
WEST SIANG
13 C/O Community Hall at Jomlo Mobuk Circle Hqr. Rumgong, Sub-Division.
11/06/2010
Rs. 10,00,000/-
WEST SIANG
14 C/O Community Hall at Ekke Village under Siyum Circle, Upper Subansiri.
24/05/2010
Rs. 10,00,000/-
UPPER SUBANSIR
15 Extension of School building i.e. Choephelling School at Tawang (Temilo).
12/07/2010
Rs. 5,00,000/-
TAWANG
16 Procurment of Ambulance for DRC, Guwahati.
11/12/2010
Rs. 5,00,000/-
   
Total
Rs. 97,50,000/-
OTHERS

                                          2ND INSTALLMENT OF 2010-11

Sl. No.
Name of the Scheme
Date of recommendation
Amount sancitoned/releaed
District
1
C/O Water Supply Tank at Doimukh Forest Colony, Ph-1.
30/15/2009
Rs. 6,00,000/-
PAPUMPARE
2 C/O Food protection at Hollongi River.
27/06/2010
Rs. 6,00,000/-
PAPUMPARE
3 C/O School Boundary Wall Foundation School, Kimin.
11/11/2010
Rs. 3,00,000/-
PAPUMPARE
4 C/O RLR form Tandapani (Taraso) to Govt. Secondary School, Taraso.
20/12/2010
Rs. 4,00,000/-
PAPUMPARE
5 C/O FDR at Guha Tarak, Jully Village, Itanagar.
07/01/2010
Rs. 4,00,000/-
CAPITAL COMPLEX
6 C/O RRM or RCC Retaining Wall for flood protection at Senki view river near CRPF Capm, Itanagar Ph-1.
11/06/2010
Rs. 10,00,000/-
CAPITAL COMPLEX
7 Renovation of Olypic/Aruanchal Pradesh Football Association Office at Rajiv Gandhi Stadium, Naharlagun.
20/12/2010
Rs. 5,00,000/-
CAPITAL COMPLEX
8 C/O Approach Road with Retaining Wall at upper C-Sector, Itanagar.
20/12/2010
Rs. 3,00,000/-
CAPITAL COMPLEX
9 C/O Protection Wall at E-Sector, Near Donyi Polo Temple, Naharlagun.
10/06/2010
Rs. 7,00,000/-
CAPITAL COMPLEX
10 C/O Recreation centre at Dokio Langpo Village under 18-Palin Constituency.
15/11/2010
Rs. 10,00,000/-
KURUNG KUMEY
11 State matching share for CSS scheme of Bambo Plantation at Nyapin under IWDP.
19/01/2010
Rs. 10,00,000/-
KURUNG KUMEY
12 C/O Retaining Wall at Back Side of PWD Office, Hapoli.
10/06/2010
Rs. 4,00,000/-
LOWER SUBANSIRI
13 C/O Boys Hostel at Bene Middle School, Ph-1.
31/12/2010
Rs. 4,00,000/-
WEST SIANG
14 C/O WRSB over Dolok river at Kangku Circle (Bango level Mopin, Hime Village) Ph-1.
14/06/2010
Rs. 10,00,000/-
WEST SIANG
15 C/O CHC at Dirang, Ph-1.
10/06/2010
Rs. 10,00,000/-
WEST SAING
   
Total
Rs. 96,00,0000/-